***************PLEASE ALLOW 2-4 DAYS FOR DELIVERY**********************
http://www.supremeconcrete.co.uk/products/structural-products/floor-beams
Concrete Beam and Block Flooring System saves time and cost on site. The floor is quick to install without the need for specialist skills. Site preparation is reduced and no hardcore or oversite concreting is required